Multi-layer steel supports and belt conveyors form the material transfer arteries. The conveyor lifts the material from a low position to a high platform, and then distributes it to each processing unit via parallel belts. Currently, the site is in the parallel installation and commissioning phase. The steel grating scattered on the ground below Figure 1 and the construction tools in the foreground of Figure 2 indicate that the main structure of the equipment has been installed, and the subsequent work will involve connecting the power wiring of the granulator and the conveyor lines. This spatial layout reflects the complete material flow chain from feeding, granulation to transfer.