Installation Site of Large Rotary Compactor in Laos: Cable Drooping Status and Unconnected Nodes Under the Main Beam
2026-08-24
January 11, 2026, Laos Site. The main body of the large wheeled compost turner has been placed on the concrete troughs on both sides. Currently, the black spiral cable on the left side of the equipment is not connected to the distribution box. Untidy cables and wire ends are scattered on the ground. The distribution box on the left wall is ready for wiring. An aluminum ladder is placed next to the left wall for personnel to access. The red motor and reducer above the main beam are installed. The black disc and gears in the middle are installed, but the power transmission belt is not connected. Two red plastic buckets are lying flat on the ground on the right side, possibly containing bolts, accessories, or lubricant. An orange forklift is parked nearby for transporting construction tools. Trees and part of the structure of a yellow excavator are visible outside the shed, indicating that site leveling and civil engineering work have been completed.