Welcome Visite our Factory!

Our Case

Jiangsu Yancheng Granulation Production Line Installation Site: Observation of Material Transfer Equipment and Overall Space Connection

2026-09-02

 The Jiangsu Yancheng granulation production line installation site. The image shows the spatial layout of the material transfer of the production line. In the image, the twin-shaft paddle mixer is mounted on a yellow support, with the feed hopper at the top and the discharge port facing downwards, forming a connection path with the conveyor below.

The image shows multiple sets of belt conveyors arranged in parallel. The red gear drive device at the front of the conveyor is linked to the motor, forming a horizontal material transfer path. One end of the conveyor connects to the green silo, and the other end extends to other areas of the workshop, forming a continuous material flow line from mixing to conveying. Scattered parts and spare conveyor belts on the ground indicate that the installation work is in its final stages, and subsequent work will involve power wiring and linkage debugging between the main units and the conveyors. The equipment in the workshop is arranged compactly, making reasonable use of space and reserving operating areas for subsequent granulation, drying, and other processes.